Thermal Power Plant
Energy Management System
Requirement
- Upgrading the existing EMS system provided by a leading OEM.
- Utilization of existing infra, including the gateways, energy meters, and servers.
- Integrate power generation meters (L&T Make), which were not connected to the existing system.
- Automated MIS reporting for compliance.
- A uniform platform for data visualization, reporting, and analytics.


Key Highlights
Enture was deployed in the existing infrastructure, utilizing the existing server and the gateways of the existing EMS, drastically reducing the overall project cost.
0Hrs
Human Hrs saved permonth
Reporting and data consolidation
0%
Existing infrastructure & hardware
Reducing the cost and time to implement.
0x
Increase in Data abstraction
Frequency rate improving the data granularity
Increased visibility in Factory operation and insights for energy efficiency
Before
- Existing On-premise EMS system by Schneider
- Data abstraction frequency - 15 mins
- Manual Report Creation
- Frequent data loss in the last 2 years due to software ageing issue
- Main generation meters (L&T make) were not connected to the EMS system - resulting in manual consolidation of data
After
- Cloud-based Enture EMS system
- Data abstraction frequency - 1 to 1.5 min
- Auto-generated customized MIS reports
- Main generation meters are connected to Enture EMS, removing the human intervention for data consolidation