nebeskie_logo
Thermal Power Plant
Energy Management System
Requirement
  • Upgrading the existing EMS system provided by a leading OEM.
  • Utilization of existing infra, including the gateways, energy meters, and servers.
  • Integrate power generation meters (L&T Make), which were not connected to the existing system.
  • Automated MIS reporting for compliance.
  • A uniform platform for data visualization, reporting, and analytics.
Case Study Image
abstract Image
Key Highlights

Enture was deployed in the existing infrastructure, utilizing the existing server and the gateways of the existing EMS, drastically reducing the overall project cost.

0Hrs

Human Hrs saved permonth

Reporting and data consolidation

0%

Existing infrastructure & hardware

Reducing the cost and time to implement.

0x

Increase in Data abstraction

Frequency rate improving the data granularity

Increased visibility in Factory operation and insights for energy efficiency

Before

  • Existing On-premise EMS system by Schneider
  • Data abstraction frequency - 15 mins
  • Manual Report Creation
  • Frequent data loss in the last 2 years due to software ageing issue
  • Main generation meters (L&T make) were not connected to the EMS system - resulting in manual consolidation of data

After

  • Cloud-based Enture EMS system
  • Data abstraction frequency - 1 to 1.5 min
  • Auto-generated customized MIS reports
  • Main generation meters are connected to Enture EMS, removing the human intervention for data consolidation